FRP072  ポスター③  8月2日 3F交流室A 10:00-12:00
KEK ATF リニアックおよびダンピング リング クライストロン高出力 RF 場の位相と振幅の安定性研究ステータス レポート
KEK ATF Linac and Damping Ring klystrons High-Power RF field phase&amplitude stability study status report
 
○ポポフ コンスタンティン,アリシェフ アレクサンダー,照沼 伸宏(High Energy Accelerator Research Organization (KEK), 1-1 Oho, Tsukuba, Ibaraki 305-0801, Japan)
○Konstantin Popov, Alexander Aryshev, Nobuhiro Terunuma (High Energy Accelerator Research Organization (KEK), 1-1 Oho, Tsukuba, Ibaraki 305-0801, Japan)
 
KEK Accelerator Test Facility (ATF) conducts beam instrumentation R&D for International Linear Collider (ILC) project. ATF includes 1.3 GeV normal conductive S-band Linac and Damping Ring (DR). There are 9 S-band pulsed klystrons at Linac, which supply High-Power RF to accelerate electron beam up to 1.3 GeV, and 1 CW klystron at DR. Linac and DR High-Power RF field stabilization will improve the ATF performance. As a first step, the RF field phase and amplitude stability was measured. This report demonstrates KEK ATF Linac and DR High-Power RF field phase and amplitude stability measurement results. Also, a solution to stabilize the RF field is discussed.